This project entailed a remodel as well as structural repairs of a 1920’s Park Hill kitchen.  Photo credit goes to Larry Laszlo CoMedia Studios.    

The Owner’s previous personal residence. House was stick framed in 1942 near Freeway Ford. Was relocated to an empty lot in the Cole neighborhood approx. 2005 and placed on a brand new foundation. Purchased by Owner as seen in the “before pic” below in 2009. Completely rewired and insulated from the

This project centered on the removal of a failed 30 year old thermal solar system. Constructed a temporary landing over an Olympic sized indoor swimming pool to stage worker and equipment. Removal of an outdated parapet wall. Addition of new gable style trusses for an updated look. Circa 2005. New v

This project involved the tear-down of a structurally-failing deck on a semi-custom track-home in the Carriage Club neighborhood of Lonetree, Colorado. We replaced the deck with the construction of a custom radius porch with final top rail laminated from Trex to curve. Time to completion: 1.5 months

Platte Park pop-top of a 1929 single story home. Complete remodel of basement and main level with added 2nd story. 2005. Viano Construction headed up demo, framing, windows, doors and hardwood floors for the GC. Time to completion for their scope was 2.5 months (demo + framing). On budget.

Total gut and remodel of a 1920’s Park Hill bathroom. All cabinets were hand made by in-house craftsmen (ie Jake ….cough…. cough…). Heated white carrera marble floor.  Custom glazed Pella window, all hardware was polished nickel, Kohler memoirs line toilet, Watermark bath-valve, Hans-Grohe shower he

Custom kitchen in Ft Collins 2011. Master Craft cabinets. Designed by Home Clearance Center in Denver. Complete remodel involving relocated walls, beams and stairs. Cost-plus project brought in on schedule.

Tear down of a non-conforming and structurally dangerous addition from 60 years ago. New two room addition on a full foundation in the historic Baker district in Denver. 2.5 months start to finish for completion. On schedule and within 5% of budget.